Date:  11-2-2010
Number of Hours:  0.10
Manual Reference:  
Brief Description:  Getting ready for wings

Well, I won't be ordering the wings until March, so until then, I'm getting things ready that I will need to assist in the wing build.

Through Avery Tools, I just purchased the SafeAir pitot-static kit, the SafeAir Angle of Attack Kit for the Dynon AOA, the SafeAir Pitot Mast for the heated Pitot I'm putting in, the SafeAir Quick Disconnect for the pitot system, the cutting and polishing kit with small scotchbrite wheels to speed up deburring, and a Rivet shaver bit.

From Van's, I ordered the Duckworks landing light kit with the 100 W bulb (I'll replace with a high intensity LED down the road), a flop tube, a stall warner kit, and 50 feet of electrical conduit.

I also plan on ordering the Extended Range Tanks Bung Kit so that I have the option down the road to add the ER tanks from Hotel Whisky Aviaiton. It's a small price now to add to the tank build ($59.50) and if I decide to add the tanks, it's a faily easy install. It gives you an additional 9 gallons of fuel.